STRIXON [RT]

Entorno restringido

Acceso reservado a usuarios autorizados

STRIXON RT opera como una plataforma técnica privada. Introduce tu clave de acceso para continuar.

Clave incorrecta. Verifica el código e inténtalo de nuevo.

Solicitar acceso

El acceso a este entorno está limitado a usuarios autorizados.

STRIXON RT
ES EN

STRIXON RT / INTEGRATION

INTEGRATION AND MISSION CONFIGURATION

STRIXON RT coordinates platform, payload, control and communications integration according to mission requirements.

PLATFORM

PAYLOADS

CONTROL

COMMUNICATIONS

01 / APPROACH

THE MISSION DEFINES THE CONFIGURATION

Each scenario is addressed through a specific selection of platform, sensors, control and communications.

STRIXON RT coordinates interfaces and responsibilities between the manufacturer, technology partners and customer within the agreed scope.

02 / INTEGRATION AREAS

NINE ELEMENTS OF A CONFIGURED SOLUTION

Each element is defined according to the platform, mission, technical compatibility and contractual framework.

01

PLATFORM SELECTION

Evaluation of the platform in relation to the environment and mission requirements.

02

SENSORS AND PAYLOADS

Coordinated payload integration according to compatibility and technical scope.

03

COMMUNICATIONS

Definition of links and communications architecture according to the intended scenario.

04

CONTROL SYSTEMS

Coordination of control interfaces for the selected platform.

05

INTEROPERABILITY

Analysis of interfaces and data exchange aligned with solution requirements.

06

MISSION CONFIGURATION

Definition of the platform, payloads and functions for a specific objective.

07

DOCUMENTATION

Coordination of documentation applicable to the solution and agreed scope.

08

TRAINING

Training coordination according to platform, configuration and contractual responsibilities.

09

LIFECYCLE SUPPORT

Support coordinated with the manufacturer and partners according to the contractual scope.

03 / PROCESS

FROM REQUIREMENTS TO SUPPORT

A coordinated process that keeps the origin of each technology and every participant’s responsibility visible.

  1. 01

    REQUIREMENTS

    Objective, environment, constraints and interfaces.

  2. 02

    SELECTION

    Suitable platform and technologies for analysis.

  3. 03

    CONFIGURATION

    Payloads, control, communications and documentation.

  4. 04

    COORDINATED INTEGRATION

    Execution within the agreed scope and responsibilities.

  5. 05

    TRAINING AND SUPPORT

    Assistance according to configuration and contract.

TECHNICAL SCOPE

COMPATIBILITY AND PERFORMANCE BY CONFIGURATION

Compatibility, communications and control functions are defined for each platform within the project’s technical scope. Applicable documentation brings together the requirements, validation and certification for each solution.

DEFINE THE INTEGRATION SCOPE

Let us review interfaces, payloads, control, communications and required support.